Project References

Three Phase Separation Skid

East Baghdad Oil Field Project in Iraq

  • Design:3000kPaG/85℃
  • Operating: 1400~1800kPaG/55 ℃
  • Capacity:591m3/d(oil),37273Sm3/d(gas),2561m3/d(water)

Three Phase Separation Skid

East Baghdad Oil Field Project in Iraq

  • Design:653psig/ 149℉
  • Operating Pressure:290~580psig
  • Operating Temp.:57~97 ℉
  • Capacity:35,314,667scf/d

Liquid Metering Skid

Metering skid of Zhongke Refiney jetty

  • Max Flow: 500m3/h
  • Design Pressure: 15 bar
  • Design Temperature: 40 ℃
  • Fluid: Crude Oil

Liquid Metering Skid

Crude oil Metering skid of Jinning Petrochemical

  • Max Flow: 2000m3/h
  • Design Pressure: 15 bar
  • Design Temperature: 40 ℃
  • Fluid: Crude Oil

Liquid Metering Skid

Crude oil Metering skid of Dongying Unite Petrochemical

  • Max Flow: 1500m3/h
  • Design Pressure: 20 bar
  • Design Temperature: 30 ℃
  • Fluid: Crude Oil

Liquid Metering Skid

Chemical Product Metering Skid of Jinyan Petrochemical

Blending & additive Skid

Blending and additive skid of China Aviation Oil

Blending & additive Skid

Blending and additive skid of Thailand National Pipline

Truck loading Skid

Truck loading skid of Thailand National Pipline Including bottom skid and upper skid